Saltar al contenido
SIEMPRE PODEREngranajes y cremalleras de precisión
Solicitud

Heavy Lifting & Long-Travel Rack Drives

Heavy positioning systems place a different emphasis on the tooth set: available feed force, shock load, structural stiffness, braking and serviceability can dominate over very fine positioning accuracy.

Hardened heavy-duty gear rack for industrial positioning
Contexto operativo

Lo que tiene que hacer la unidad de rack

Larger tooth size, greater face width, stronger material routes and hardened teeth may be considered when the duty requires them, but the correct combination has to be checked against the actual load case. A nominal module by itself is not proof of capacity.

La aplicación debe describirse como un eje completo. Esto significa que el sistema de engranajes de la cremallera, el piñón, la interfaz de la caja de engranajes, la base de montaje y el método de lubricación se analizan en conjunto, en lugar de asumir que la cremallera por sí sola determina el rendimiento.

Datos de selección

Defina la función de la máquina antes de fijar el componente.

Estos datos marcan la diferencia entre un presupuesto basado únicamente en la geometría y otro que refleje cómo se utilizará realmente la unidad.

Load case Moving mass, vertical load, external process force, shock and emergency-stop conditions.
Duty Speed, acceleration, starts per hour and continuous/ intermittent operation.
Drive arrangement Single or multiple pinions, gearbox ratio, brake and shaft/bearing support.
Structure Rack support spacing, base stiffness and deflection under load.
Service Lubrication access, inspection interval and replacement strategy.
Ajuste de componentes

Productos que se evalúan habitualmente para esta aplicación.

Las opciones que se muestran a continuación son puntos de partida, no selecciones automáticas. La idoneidad final depende del dibujo y de los datos de funcionamiento.

Cremallera de engranajes endurecida por inducción

Cremallera de engranajes endurecida por inducción

Wear-resistant rack option for repeated industrial motion.

Ver producto

Cremallera de engranajes mecanizada a medida

Cremallera de engranajes mecanizada a medida

For non-standard section sizes, holes, ends or structural interfaces.

Ver producto

Eje del piñón

Eje del piñón

One-piece shaft and gear option where the drive architecture requires it.

Ver producto

Integración

Los detalles de la instalación pueden anular o preservar el valor de una cremallera de precisión.

Check the mounting structure for deflection under the worst load case. Misalignment caused by frame movement can reduce contact quality even when the rack itself is accurately made.

For lifting or vertical axes, the rack is only one part of the safety chain; braking, holding and control functions remain machine-level responsibilities.

Provide access for lubrication and tooth inspection, especially on equipment where the rack is partially enclosed after commissioning.

Heavy pinion shaft component for industrial positioning
Preparación de la solicitud de cotización

Información que debe enviarse con la solicitud de información.

Send the maximum operating and peak/emergency loads, axis orientation, travel, speed, acceleration, duty, gearbox ratio, brake concept, pinion dimensions and structural mounting layout. If an existing drive is being replaced, include the previous part dimensions and the reason for replacement.

Si algunos valores aún están abiertos, márquelos como objetivos de diseño. Esto es más útil que insertar una especificación aproximada que luego resulte difícil de modificar.

¿Tienes un dibujo o datos de aplicación?

Envía los detalles que definen la pieza.

Un presupuesto útil comienza con la geometría y el contexto de funcionamiento. Envíe el plano, la cantidad y los requisitos de control; para ejes accionados por cremallera, añada el recorrido, la velocidad, la aceleración, la carga y la información del piñón o la caja de engranajes correspondiente, si está disponible.

Pedido: La cantidad mínima de pedido (MOQ) es flexible según el tipo de producto y el valor del pedido. Las muestras adecuadas para nuevos clientes pueden ser de 1 a 5 unidades; se admiten pedidos de modelos mixtos a partir de 1500 USD en total, mientras que se pueden considerar pedidos de 1 a 2 unidades a un precio unitario más alto.

Plazos y condiciones: El plazo de entrega habitual para piezas estándar es de 10 a 25 días laborables, para componentes personalizados de 20 a 45 días y para equipos de proyecto de 45 a 120 días. Los términos EXW, FOB, CIF y DAP son habituales; FCA, CFR, CPT, CIP y DDP pueden analizarse caso por caso.

Enviar solicitud de cotización