Ir para o conteúdo
PODER ETERNOEngrenagens solares e componentes planetários
Sobre a EVER POWER

About EVER POWER – Sun Gear & Precision Gear Supply

EVER POWER supports drawing-based Sun Gear, gear shaft and planetary component projects for industrial OEM, replacement and transmission applications.

About EVER POWER – Sun Gear & Precision Gear Supply
Gear shafts and precision gear components
What we supply

Sun Gears are the focus; the mating components complete the system.

The Sun Gears programme is built for buyers who already have a drawing, an existing planetary gearbox to support, or a new gear stage that needs manufacturing review. Core products include spur and helical sun gears, ground and heat-treated sun gears, splined sun gears and integrated sun gear shafts.

When the project requires more than the central gear, planet gears, internal ring gears, carriers and planet pins can be reviewed as companion components. That keeps the site focused on Sun Gears while still reflecting how planetary transmissions are actually assembled.

How we work

Drawing review before manufacturing assumptions.

Gear work becomes risky when a quotation is built from a photograph and outside diameter alone. Our RFQ process asks for the tooth system, interfaces, material/heat treatment, quality requirement and mating context first. Where information is missing, the open item is identified instead of silently guessed.

01

Enviar desenho e dados planetários

PDF/STEP, revisão, quantidade, aplicação e quaisquer informações disponíveis sobre engrenagens de acoplamento.

02

Confirme a geometria do dente

Módulo/DP, número de dentes, ângulo de pressão, forma da espora/hélice, ângulo da hélice e sentido de rotação.

03

Confirmar interfaces

Relações entre furo, estrias, eixo, mancais, ressaltos e pontos de referência funcionais.

04

Plano de materiais e tratamento

Mantenha os requisitos de material, cementação/nitretação/dureza e revestimento vinculados ao projeto aprovado.

05

Fabricação e acabamento duro

Sequências de torneamento, corte de engrenagens, usinagem de estrias, tratamento térmico e retificação, conforme necessário.

06

Inspecionar características controladas

Verificar a geometria do dente juntamente com as relações entre furo/estria/munhão e face.

07

Embalar e enviar

Embalagem para exportação e Incoterm acordado para a quantidade liberada.

Manufacturing coordination

Different Sun Gears need different process routes.

A small spur sun gear, a carburized ground helical sun gear and a long integrated gear shaft should not be pushed through one generic process. Depending on the drawing, production can involve turning, hobbing, shaping, spline machining, heat treatment, tooth grinding, journal grinding and final inspection.

For repeat programs, the process can also include dedicated fixtures, gauges and agreed inspection records. The goal is a repeatable ordered configuration rather than a catalogue-style claim that every gear receives the same treatment.

Quality communication

Keep standards and acceptance criteria visible.

Customer drawings may use ISO, DIN, AGMA, JIS or internal specifications. We keep those requirements attached to the part instead of converting grades by assumption. If a substitution or alternative material is proposed, it should be approved before production.

Sales enquiries are handled through [email protected]. The published contact address is 8–10 Ventura Place, Dandenong South, Victoria, Australia 3175.

Precision finished gear component
Working with new projects

Prototype, replacement and recurring OEM orders are all quoted from the same technical foundation.

MOQ is flexible according to product type and order value. Suitable new-customer samples can be 1–5 pieces, while mixed-model orders can be considered when the combined value is around USD 1,500 or more. Very small quantities such as 1–2 pieces may also be possible with a higher unit cost because tooling, setup and inspection have to be absorbed by fewer parts.

Standard parts are commonly planned around 10–25 working days, custom components around 20–45 working days, and project equipment around 45–120 days. EXW, FOB, CIF and DAP are common commercial terms; FCA, CFR, CPT, CIP and DDP can be discussed case by case.