Drawing-to-Part Gear & Rack Manufacturing
EVER POWER coordinates the manufacturing route around the drawing: material, tooth generation, heat treatment, finishing, secondary machining and inspection. The exact process is selected for the part rather than presented as one fixed recipe.

Process choice follows the requirement.
A general-purpose rack may be milled and normalized or induction hardened. A positioning rack may need ground tooth flanks and tighter control of pitch, parallelism and straightness. Custom gears may add turning, hobbing, shaping, keyways, bores or external grinding depending on the geometry.
Send drawing or axis data
PDF/STEP, quantity and use case.
Confirm tooth geometry
Module/pitch, pressure angle and tooth form.
Select material & finish
Material, hardness and ground/milled route.
Review mounting details
Holes, ends, pinion and gearbox interface.
Manufacture & heat-treat
Processing follows the ordered configuration.
Inspect controlled features
Dimensions and tooth data per drawing/PO.
Pack & ship
Export packing and agreed Incoterm.
Common drawing details we review
| Gear geometry | Module/DP/CP, tooth count, pressure angle, helix angle and profile shift when applicable. |
|---|---|
| Material | Specified grade or a functional requirement for strength, wear or corrosion. |
| Heat treatment | Target hardness, case depth or treatment route if controlled by the drawing. |
| Machining | Bores, keyways, splines, threaded holes, counterbores, datum faces and end matching. |
| Inspection | Drawing tolerances, gear-quality requirements and requested reports. |
| Order data | Prototype/production quantity, annual demand, packaging and required delivery terms. |
Send the details that define the part.
Module or pitch, tooth form, material, heat treatment, length, quantity and a drawing are the fastest way to get a useful quotation.
Ordering: MOQ is flexible by product type and order value. Suitable new-customer samples can be 1-5 pcs; mixed-model orders are supported around USD 1,500+ combined, while 1-2 pcs can be considered at a higher unit price.
Timing & terms: Standard parts are typically 10-25 working days, custom components 20-45, and project equipment 45-120. EXW, FOB, CIF and DAP are commonly available; FCA, CFR, CPT, CIP and DDP can be discussed case by case.