Drawing-to-Part Gear & Rack Manufacturing
EVER POWER coordinates the manufacturing route around the drawing: material, tooth generation, heat treatment, finishing, secondary machining and inspection. The exact process is selected for the part rather than presented as one fixed recipe.

Process choice follows the requirement.
A general-purpose rack may be milled and normalized or induction hardened. A positioning rack may need ground tooth flanks and tighter control of pitch, parallelism and straightness. Custom gears may add turning, hobbing, shaping, keyways, bores or external grinding depending on the geometry.
Send drawing or axis data
PDF/STEP, quantity and use case.
Confirm tooth geometry
Module/pitch, pressure angle and tooth form.
Select material & finish
Material, hardness and ground/milled route.
Review mounting details
Holes, ends, pinion and gearbox interface.
Manufacture & heat-treat
Processing follows the ordered configuration.
Inspect controlled features
Dimensions and tooth data per drawing/PO.
Pack & ship
Export packing and agreed Incoterm.
Common drawing details we review
| Gear geometry | Module/DP/CP, tooth count, pressure angle, helix angle and profile shift when applicable. |
|---|---|
| Vật liệu | Specified grade or a functional requirement for strength, wear or corrosion. |
| Xử lý nhiệt | Target hardness, case depth or treatment route if controlled by the drawing. |
| Gia công cơ khí | Bores, keyways, splines, threaded holes, counterbores, datum faces and end matching. |
| Điều tra | Drawing tolerances, gear-quality requirements and requested reports. |
| Order data | Prototype/production quantity, annual demand, packaging and required delivery terms. |
Hãy gửi thông tin chi tiết xác định bộ phận đó.
Module or pitch, tooth form, material, heat treatment, length, quantity and a drawing are the fastest way to get a useful quotation.
Đặt hàng: Số lượng đặt hàng tối thiểu (MOQ) linh hoạt tùy thuộc vào loại sản phẩm và giá trị đơn hàng. Mẫu dành cho khách hàng mới phù hợp có thể là 1-5 chiếc; đơn hàng nhiều mẫu sản phẩm có tổng giá trị khoảng 1.500 USD trở lên được hỗ trợ, trong khi đơn hàng 1-2 chiếc có thể được xem xét với giá đơn vị cao hơn.
Timing & terms: Thời gian giao hàng các linh kiện tiêu chuẩn thường là 10-25 ngày làm việc, linh kiện đặt làm riêng là 20-45 ngày, và thiết bị dự án là 45-120 ngày. Các điều khoản EXW, FOB, CIF và DAP thường được áp dụng; FCA, CFR, CPT, CIP và DDP có thể được thảo luận tùy từng trường hợp.