Drawing-to-Part Gear & Rack Manufacturing

EVER POWER coordinates the manufacturing route around the drawing: material, tooth generation, heat treatment, finishing, secondary machining and inspection. The exact process is selected for the part rather than presented as one fixed recipe.

Machined custom gears

Process choice follows the requirement.

A general-purpose rack may be milled and normalized or induction hardened. A positioning rack may need ground tooth flanks and tighter control of pitch, parallelism and straightness. Custom gears may add turning, hobbing, shaping, keyways, bores or external grinding depending on the geometry.

01

Send drawing or axis data

PDF/STEP, quantity and use case.

02

Confirm tooth geometry

Module/pitch, pressure angle and tooth form.

03

Select material & finish

Material, hardness and ground/milled route.

04

Review mounting details

Holes, ends, pinion and gearbox interface.

05

Manufacture & heat-treat

Processing follows the ordered configuration.

06

Inspect controlled features

Dimensions and tooth data per drawing/PO.

07

Pack & ship

Export packing and agreed Incoterm.

Common drawing details we review

Gear geometry Module/DP/CP, tooth count, pressure angle, helix angle and profile shift when applicable.
Materiaal Specified grade or a functional requirement for strength, wear or corrosion.
Warmtebehandeling Target hardness, case depth or treatment route if controlled by the drawing.
Machining Bores, keyways, splines, threaded holes, counterbores, datum faces and end matching.
Inspection Drawing tolerances, gear-quality requirements and requested reports.
Order data Prototype/production quantity, annual demand, packaging and required delivery terms.
Have a drawing or application data?

Send the details that define the part.

Module or pitch, tooth form, material, heat treatment, length, quantity and a drawing are the fastest way to get a useful quotation.

Ordering: MOQ is flexible by product type and order value. Suitable new-customer samples can be 1-5 pcs; mixed-model orders are supported around USD 1,500+ combined, while 1-2 pcs can be considered at a higher unit price.

Timing & terms: Standard parts are typically 10-25 working days, custom components 20-45, and project equipment 45-120. EXW, FOB, CIF and DAP are commonly available; FCA, CFR, CPT, CIP and DDP can be discussed case by case.